Gap Analysis — vs Primavera, Fohlio & Construction Tech Stack
Internal capability assessment across scheduling, FF&E, construction, finance and governance; not independently verified parity.
v3.33 assessment scope and remaining gaps
Verified: allocation drilldowns, three-element IFC import with one mesh clash, project/company posted-ledger statements, scheduler analysis subtabs, CDE tabs, FF&E PDF/ZIP downloads and phone controls.
Still incomplete: BIM quantity extraction and persistent models; licensed rates and large-data pilots; full warehouse operations and shared material masters; live Autodesk/carriers/banks/external ERP; statutory tax/clearance; multi-currency company consolidation; independent vendor and owner/CAFM acceptance. Route/tab checks do not certify every transaction or approval.
Internal, equally weighted feature coverage, not product quality, market share, certification or proof of enterprise parity. Full = 1, partial = 0.5, gap = 0. Planned AI earns no implementation points. Vendor scores are directional, not independently validated; unreviewed rows need vendor/edition confirmation. Brief sources checked 13 November 2026. Each percentage belongs to the product on its card—not ConstructiumAI’s readiness against that product. Percent = (full + 0.5 × partial) ÷ feature count × 100.
- Unified platform. Primavera + Fohlio + Procore are three siloed tools. We connect operational workflows in one project workspace; replacement of specialist enterprise tools has not been established.
- FF&E ↔ CPM linkage. Room specifications, purchasing and programme evidence can be reviewed together; activity-linked risk warnings are explicit, not a live supplier prediction.
- Embedded GRC. Project risk/control evidence sits alongside operational workflows. Framework mapping is not certified attestation.
- AI copilot. Existing assistance drafts, extracts and explains; the new module blueprints are proposed expansions, not autonomous approvals.
- Live 3D BIM viewer. Orbit/pan/zoom, view presets (ISO/Top/Front/Side), wireframe, X-ray ghost mode, explode slider, saved-view bookmarks, PNG screenshot. /bim.
- Clash-to-3D navigation. Click a clash row → camera flies to the colliding meshes and highlights them in red.
- PDF takeoff & measurement. Bluebeam-style calibrate · length · area · count tools with CSV + RFQ export. /takeoff.
- Takeoff → RFQ workflow. PDF measurements and 3D distances both auto-draft RFQ line items with configurable unit rates. RBAC-gated by
create_rfq. - BIM / Takeoff reference handoff. Geometry review and tagging support coordination; durable bidirectional synchronization and validated BIM-to-BOQ remain incomplete.
- Global AI Copilot with action tool-calling. Available action tools cover navigation, tasks, notes and schedule-health entry; module-wide autonomous operations are not implemented.
- Monte Carlo schedule risk. Triangular-distribution simulation with P50/P80/P90 and criticality index.
- Drawing version control + markup. SVG ink, per-revision layers, supersede workflow.
- Native BIM coordination. IFC federation, clash matrix, ISO 19650 CDE buckets.
- Global record drawer. Every chart bar and table row opens a context-aware sheet with drill-down stack and keyboard shortcuts (Esc · Backspace · ←/→).